Double Span Bridge Construction in Tehran-Shomal Highway

 

Picture7

 

 

Project: Double Span Bridge Construction in Tehran- Shomal Highway

Employer: Tehran-Shomal highway company

Contract: PC

Start and finish date: 2007-5-27 until 2008-11-27

Discipline:

  • Civil
  • Mechanical
  • Electrical

Highlights:

The Bridge consisted of plate girder on each side, 100,000 kg girders. The bridge was constructed using strand jacks. The jacks were arranged in a "pull-push" configuration enabling accurate and thorough control throughout the installation of the main elements (girders).

Items of works:

 

Earth works

45,000 m3

Earth fill works

250,000m3

Reinforcement

450,000 kg

Concreting

4,000m3

Steel structures

1,000,000 kg

 