Project: Ahwaz Sewer Pipe Line Project
Employer: Ahvaz' water and wastewater company
Contract: PC
Start and finish date: 2011-8-13 until 2013-2-10
:Discipline
:Main Items Of Work
circular reinforced concrete
piping of 1200 mm diameter
circular reinforced concrete
piping of 800 mm diameter
Project: Complete rehabilitation and revamping of IrankhodroSaze Company (Peikanshahr)
Employer: Irankhodrosazeh Company
Contract: PC
Start and finish date: 2008-4-20 until 2008-7-20
Discipline
Highlights
Complete rehabilitation and revamping of a 4 story building to transform an old residential building to office. Including the complete removal of partition and loading bearing walls to create a completely open office area, including of mechanical and electrical rooms of facility together with complete smoke/fire
.detection system
Items of works
Project: Double Span Bridge Construction in Tehran- Shomal Highway
Employer: Tehran-Shomal highway company
Contract: PC
Start and finish date: 2007-5-27 until 2008-11-27
Discipline:
Highlights:
The Bridge consisted of plate girder on each side, 100,000 kg girders. The bridge was constructed using strand jacks. The jacks were arranged in a "pull-push" configuration enabling accurate and thorough control throughout the installation of the main elements (girders).
Items of works: |
|
Earth works |
45,000 m3 |
Earth fill works |
250,000m3 |
Reinforcement |
450,000 kg |
Concreting |
4,000m3 |
Steel structures |
1,000,000 kg |